Description
This document explains the main features of a sample Work and Time Schedule prepared in the form of a Milestone Summary Schedule for a power plant on Excel format which shows the main and secondary targets determined by the Owner and Contractor or depending on the technical sequence of the work, mainly affected by the delivery of major plant equipment. These types of programs are mostly used as a guide for senior management groups. More detailed programming on a daily basis depending on the supply of secondary equipment and materials, and ultimately the Critical Path Method programming will be applied on them in order to determine on which activity the allocation of the resources should be concentrated for the compensation of delay in work and its timing. It is a non-commercial document and can be fully viewed freely on this WEB Site.